12-01-2025 : my uplifting music list top 12
1- Return to innocence - 417
2- Shine On You Crazy Diamond, - 1245
3- Always watching 15:12 - Pikes #150 - 3000
4- Sorrow 13:30 - 2234
5- Comfortably Numb - 951
6- Best "Echoes" performance - 2234
7- The Missing Key - 342
8- You are - 514
9- One Love - 244
10- Lay All Your Love On Me - 440
11- Inception - Time - [Remake] by Patrik Pietschmann - 423
12- AIR - All I Need - 432
#1 - Return to innocence
#2 - Pink Floyd - Shine on You Crazy Diamond PULSE Remastered
#4 - David Gilmore - Fender's 50th Birthday Celebration with 13:30 Sorrow (one world one soul time past the river rolls = 3246 = we need to save america and the world = everyone on earth was born for a good reason)
#5 - Pink Floyd - Comfortably Numb - pulse concert performance 1994
#6 - Pink Floyd - Best "Echoes"performance
#7 - The Missing Key
#8 - Dolly Parton - You are -
#10 - ABBA - Lay All Your Love On Me (Official Lyric Video)
#11 Inception - Time (Piano Version) [Remake] by Patrik Pietschmann
#12 Air - AIR - All I Need (Official Video)
01-12-2025: For work I am looking for machine woodworking , designing , R&D , truck driving , logistics , production or garden work and , my passion : woodworking. For the future I wish to work 10 month per year or 1280 hours in a mobile environment , if can for service to others , or creating and building my own designed roofstructures.
Leo is a 33+ years experienced structural drawing (Tekla), designer, BIM-enthusiast, experienced to the prefabricating building industry (precast) and very solution driven.
In 1989 he graduated from MTS in Rotterdam as a machine wood fabrication carpenter with a specialty for wood skeleton buildings (HSB).
After this Medium Technical College, he went into the Dutch army as a 4-tons truckdriver for the 41 tank battalion in Hohne Germany, to join different tasks in transporting personnel, equipment, fuel, and cleaning roads.
In 1990 he started to design as casco construction drawer at Heembeton where the main target was to translate architectural project designs of housing types into workable prefabricated concrete casco parts for the factory plants, in the meantime communicating with structural engineering Brekelmans for stability and rebar information, and the subcontractors for concrete inserts, s.a. Electrics and mountings.
After a merger of the centralized office from Arnhem to a factory in Lelystad he started to work for Heijckman architect and construction office in Huissen (later merged into Cumae) where he was doing the same kind of work as at Heembeton but now to improve the quality of the division casco engineering Heembeton at Heijckman, with a work guaranty for 3 years and for 2 persons. Heijckman was also specialized in engineering wood roof constructions for the (HSB) production industry, he also engineered these specific kind of 2D roof constructions on Autocad.
In 2000 until 2007 he worked as a drawing engineer at Romein Beton on the department engineering on Autocad mechanical desktop, this factory for very diverse civil (Ground W road Waterways) was located in Dodewaard and had a unique site with the main office, canteen, prefab-storage, production halls, central concrete mixing plant, re-bar plant, and wood framing plant, and assembly storage unit all located in one site.
Romein Beton was also a Dutch pioneer in the self thickening concrete for use in the diverse mixing batches or colored concrete.
He had a good drawing-education via the Dutch Learning Organization of Concrete (Betonvereniging) to become precast drawer BV. He also Co-engineered the Bubbledeck precast slab-floor for the Benelux countries, specifically for a factory Gelissen Beton in Beek. In may of 2007 he succeeded to get a job in the wood-industry via detachment office Brunel Arnhem, and got on-board with a company called HKN-Ulft a wood framing company and full daughter of Pontmeyer, but he could not emphasize a reorganization and closure of this roof, barn and frame factory. At the end of July 2007 the factory closed and was merged into the factory in HKN- Heerenveen he managed to work there until the end of 2007 as a troubleshooter.
In February 2008 he started as 3D modeler with Tekla Structures at CD20 Buildingsystems in Arnhem, after a education period of 6 days at Construsoft in the software, his general package of work was: acquisition modeling , modeling building structures of projects like schools, office buildings, hotels and parkings from begin through production of prefab and providing information to and assisting assembly. At last he worked in CD20 building systems 32 hours per week on acquisition, the fastest structural concrete building system in the world, in a Tekla (Trimble) structures cloud and on a multilingual platform on big projects with a wide range of various disciplines (or BIM).
On 01-07-2020 he startet his club : leorieswijk.club a non profit service to others platform for online help or local help to others , Would be great if everyone did this one day a week. (i believe i am 10 years to early working this out)
12-25-2024 progressed the hourly bill structure for myself and the calender for planning/hiring in 2025 , the whole purpose of this idea for me was to visualise for myself the value of time.
12-26-2024 i stopped projecting what i want to see change , and try to be the change i want to be.